Building a house in Pagosa Lakes: the PLPOA rules in plain English

​

If your lot is in one of the Pagosa Lakes subdivisions, the Pagosa Lakes Property Owners Association reviews your plans before the county will issue a building permit. The review is done by the Environmental Control Committee, and the rules it works from run to well over a hundred pages. This page is the short version, taken from the association's own documents, with links to those documents at the bottom.

​

The order matters

PLPOA approval comes first. The county building department wants the approval letter in hand with your permit application, and the fire district impact fee is paid after the association signs off. So the plans go to the PLPOA before the building permit application.

​

What you submit

  • A signed application, and a project agreement signed by you and your contractor.

  • A site plan prepared by a Colorado licensed surveyor, showing the lot corners, the setbacks and easements, the foundation dimensioned to two property lines, and any tree over 6 inches that will come out.

  • Two complete sets of plans: foundation, every floor level, four elevations and a wall section, with the roof pitch, siding, trim, fascia and roofing called out on one elevation, and the path from the driveway to the front door drawn in.

  • A landscape plan.

  • A drainage plan, if the association asks for one.

  • A description of the exterior materials, with a color sample for the siding, roof, trim, fascia, doors and any exposed foundation.

  • Exterior light fixtures, shown as fully shielded.

  • The county access permit for the driveway.

  • The fee.

When they meet, and how long approval lasts

The committee holds work sessions on the first and third Wednesday of each month, and plans go in at least two weeks ahead of these meetings. The approval is good for six months. If the house isn't finished by then, you ask for an extension in writing before it expires, and the extension fees climb with each six-month period. A project still open after two years goes back to the committee for review.

 

What it costs

The association's fee for a new house is $1,110, which is a $30 filing fee and a $1,080 inspection fee. An As-Formed survey, when one is required, adds $100. Paying by card adds 2.99 percent. Starting work before approval adds a $100 late fee. Fees change from time to time, so check the current schedule.

San Juan peaks glowing at winter sunset, seen through snow-covered pines

The rules that show up on the drawings

These are the ones that affect the design, which is why I build them into the plans from the start.

  • An enclosed garage at least 12 by 20 feet for each living unit.

  • A covered entry at the front door of at least 32 square feet.

  • Eaves at least 12 inches past the wall.

  • A roof with a stepped ridge or other breaks, not a straight box. No wood shakes. Asphalt shingles only in architectural grade. Metal roofing is also approved.

  • No snow shedding onto the garage doors, the entry doors or the sidewalk to the front door. That sidewalk must be drawn on the site plan so the committee can check it.

  • Trim and fascia at least 3/4 inch thick. No glossy finishes. Exposed foundation more than 6 inches above grade is colored or textured to blend in.

  • Colors are judged on site against every home within 300 feet. Earth tones are strongly preferred.

  • Setbacks vary by subdivision and lot. A common pattern is 30 feet front, 20 feet rear and 10 feet on the sides, with 50 feet from a golf course. Most single-family lots allow 35 feet of height. If any part of the house sits within 3 feet of a setback line, a surveyor certifies the foundation forms before the concrete is poured. This is called an As-Formed survey.

  • Exterior lights fully shielded, mounted no higher than the eaves or 12 feet, with the fixtures approved before plan approval.

  • A driveway entrance no wider than 30 feet, two off-street parking spaces of 9 by 20 feet, and a culvert at the road built to county specifications.

  • Mechanical equipment and propane tanks screened on three sides, and not with lattice.

  • No tree cut without written approval. The approval for cutting a tree is free, but it has to be in hand first.

Modern mountain home with a timber-framed entry and stone walls at sunset, among ponderosa pines

On the job site

Work hours are 7 a.m. to 7 p.m. on weekdays, 8 to 7 on Saturdays and 9 to 7 on Sundays. A portable toilet is required on-site from excavation until the indoor plumbing works. A trash enclosure is required on-site, emptied at least monthly. No open burning. The association approves dumpsters and construction trailers separately. On golf course and lakefront lots, a silt fence must be installed before excavation starts. The green permit card must be posted until the house is finished, and the landscaping must be restored within nine months of completion.

​

Who to call

Department of Community Standards, 230 Port Avenue, Pagosa Springs. 970-731-5635, extension 201. permitting@plpoa.com.

​

The documents

PLPOA permits and applications, with the full Project Permit Process

Architectural and environmental standards (Section 3)

Fee schedule (Section 9)

Setbacks and height limits by subdivision (Section 10)

Application for a new single-family home

Archuleta County Building Department

​

Related pages

I own land in Pagosa Springs. Now what, and in what order?

The 2027 building code changes

Water, sewer, well and septic in Pagosa Springs: find out before you buy

​

Where this comes from

Pagosa Lakes Property Owners Association, Improvement Design Standards and Project Permit Process, Sections 1, 3, 4, 9, 10 and 14, revisions effective 2024 through January 2026. Reviewed October 2026.