What changes on January 1, 2027
The county moves to the 2024 building codes on January 1. The Town of Pagosa Springs already did, last July. If your lot is inside town limits you're already on the new codes. Anywhere else in the county, they apply starting in the new year.
Wildfire is the exception. The 2025 Colorado Wildfire Code has been in force county wide since July 1, 2026, so that part is not exactly new. But there are a lot of questions and confusion around the code, so I will discuss it here.
Three changes will matter to you. Most of the rest you'll never notice.
Snow loads
For years the county used one roof snow load everywhere. 65 pounds per square foot, the same down by the river as up on the mountain at 9,000 feet.
From January 1 your roof will be designed to a load figured for your exact lot. Here's roughly where that lands and what it does to the framing.
Downtown and the river valley, 7,100 to 7,400 ft
65 pounds goes to about 72. Minimal changes to beams, headers and roofing members.
Pagosa Lakes and north of town, 7,400 to 8,500 ft
65 goes to about 90. Larger ridge beams and heavier roof members. Trusses re-engineered.
Higher country, 8,500 ft and up
65 goes to about 115. Bigger beams and members, and possibly larger footings at bearing points.
Two of the lots we checked sit seven hundred feet apart in elevation but came back with nearly identical snow loads because of the lot locations. Terrain and exposure matter as much as elevation, which is why the load has to be pulled for the parcel instead of given a number based solely on elevation.
For your home, we will pull the report from the ASCE hazard tool, and it becomes the basis for engineering on your house.

Energy
Wall insulation goes up from R-19, and the code gives you four ways to meet the new requirements.
-
R-30 in the cavity
-
R-20 in the cavity plus R-5 continuous
-
R-13 in the cavity plus R-10 continuous
-
R-20 continuous, with nothing in the cavity
One common solution is the second path. A 2x6 wall with a high-density R-21 fiberglass batt and about an inch of rigid foam on the outside.
The other common solution is closed-cell spray foam. At roughly R-7 an inch it fills a 2x6 cavity to better than R-30 by itself, so you meet the first path with no foam on the outside at all.
With batts alone, R-30 in the cavity would take 2x8 framing or a double wall. This path is rarely used.
Below-grade walls change from R-7.5 to R-15. Windows go to a maximum U-factor of 0.30.
All of that will cost more up front, but the house will be cheaper to heat and cool.
Wildfire
Both the county and the town are on the state wildfire code now. Of the three changes, this one affects your construction the most.
How much of it applies depends on how your lot is mapped on a state fire map. Lots get rated by how a fire would likely behave on them, which comes down to the fuel, terrain and weather. Low fire intensity gets a short list. Moderate and high get the full list. Most of Archuleta County lands in the moderate fire intensity group.
The short list
A Class A roof. Fire rated attic and crawl space vents, or eighth-inch metal mesh over the openings. Noncombustible gutters if the house has them. And the first five feet around the house kept clear of anything that burns.
The full list adds the walls and everything attached to them
Siding has to be noncombustible, fire treated, or a tested ignition-resistant product. Specially treated wood sidings can also be used, and many other siding options are available, including products that are metal but look like board and batten or log siding. Inspectors here are also allowing other sidings over a wall that is noncombustible or one-hour rated underneath. That is how it is being read right now rather than what the code text says, so confirm it before you count on it.
Eaves and soffits now must be covered on the underside, and fascia boards are now required. Decking must be noncombustible or Class A material, and composite decking needs a Class B rating at minimum. The space under the floor gets closed off to the ground. Six inches of noncombustible flashing goes behind the siding where the wall meets the ground, a deck or a roof.
Windows
There's a rumor going around that everyone will need fire rated glass. This isn't true. The code gives you four ways to comply and one of them is an ordinary dual-pane unit. We checked with two window suppliers and neither of them sees much changing for the fire codes. A two-pane low-E window already meets the fire code. What drives your window choice here is the energy code.
The ground around the house
The first five feet has to be rock, gravel, concrete or bare earth. No shrubs, no bark mulch, and no new trees. A mature tree already standing there can stay if it's at least ten inches through, with the crown pruned back ten feet off the house. From five to thirty feet from the house, you thin and space out trees and shrubs. From thirty to a hundred feet, tree crowns get six to ten feet apart.
In town, a landscaping plan showing fire code compliance must be submitted with the permit application. The county doesn't ask for this on the drawings yet, but the requirements still apply.
If you're remodeling instead of building
Replace a quarter or more of your roof, or a quarter or more of your siding, and the entire roof or wall must come up to the new standard. An addition under 500 square feet doesn't trigger the new codes. A parcel of 35 acres or more with one house on it, not up against a developed area, is exempt.
These codes are new here. How they get interpreted will vary some by inspector until everyone settles in.

What isn't changing
More than you'd think. Foundations stay the same. The county has used the same standardized footing and stem wall requirements for years, and those standard details aren't changing. Frost depth stays at 42 inches. Fire sprinklers still aren't required in a house. Permit fees are the same, and the building department doesn't expect plan reviews to take any longer.
If you've built here before, most of what you know still applies.
If you're building in 2027
Three things to settle before bids go out or anyone orders material.
Pull the snow and fire numbers for your parcel first, before the structural drawings are completed.
Decide the wall section early. Cavity foam and exterior insulation build a different wall, and the choice has to be made during the design.
Lay out that first five feet on the site plan. Driveway, patio, walks and grade. It costs nothing to move on paper.
Let me know what you're building and where, and I'll advise you on how to proceed.
Related pages
Do you need an architect to build a house in Archuleta County?
I own land in Pagosa Springs. Now what, and in what order?
Where this comes from
Archuleta County Resolution 2026-50, adopted June 23, 2026 and effective January 1, 2027. Town of Pagosa Springs Ordinance 1034, effective June 2026. The 2025 Colorado Wildfire Resiliency Code. Reviewed October 2026.
.png)