The 2027 energy code changes in Pagosa Springs

​​​

Of the changes coming January 1, this is the one that shows up in the wall system. It is also the one with the most ways to satisfy it, which is good news if you plan for it, but expensive if you catch it late.

​​

The Town and the county got to their numbers by different routes. The Town adopted the state table as written. The county wrote its own version of it, but in the end the numbers are almost the same for Town or county. 

​​

There is one exception and it only matters if you are pouring a heated floor. Inside town limits a heated slab needs R-10 insulation at the edge and R-5 under the whole slab. The county lets you do one or the other. The numbers below are the county's.

​​

The county's numbers, before and after​

Walls

Was R-19. Now R-30 in the cavity, or one of three mixes (shown below).

​

Below-grade walls

Was R-7.5. Now R-15 continuous.

​

Heated slabs

Was R-15 for the entire slab. Now R-5 for the entire slab.

​

Floors

R-30. Unchanged.

​

Roof

R-49. Unchanged.

​

Windows

Was U-0.32. Now U-0.30.

​

Skylights

Was U-0.55. Now U-0.50.​

Great room with heavy timber trusses, a stone fireplace and a wall of windows looking out to the trees

The wall is the biggest change in code. R-19 to R-30 is not a small step, and you cannot get there with a thicker batt in a 2x6.

​

Four ways to build the wall

PATH 1

R-30

all in the cavity

PATH 2  ·  MOST COMMON

R-20 + R-5

cavity plus continuous outside

PATH 3

R-13 + R-10

cavity plus continuous

PATH 4

R-20

all continuous, empty cavity

The second path is the most common one. A 2x6 wall with a high-density batt and about an inch of rigid foam outside the sheathing. There is Zip sheathing that includes attached R-6 foam that is often used for this purpose.

​

The other common answer is closed-cell spray foam. At roughly R-7 an inch it fills a 2x6 cavity past R-30 on its own, so you meet the first path with no foam on the outside at all. In general, the spray foam costs more and is considered the best type of insulation for many reasons, including the fact that is also its own air and vapor barrier. Both systems can be called out on the plans and final decisions can wait until the bidding stage.

​

With batts alone you would need 2x8 framing or a double wall. Almost nobody does that here.

​

The table is not the only way to pass

The county says that their energy path is written as an alternative, and their amendment adds:

“Alternative paths may include energy calculations through ComCheck/ResCheck or other approved standard or compliance path. Table R402.1.3 is not all-inclusive.”

A fixed table of R-values cannot cover every wall anyone might build. So, the county lets you show whole-house performance with a program like ResCheck, instead of matching the table line by line. This calculation includes floors, walls, windows, doors, roof system, and heating systems, all to show the energy compliance of the entire home.

​

Windows

Both the Town and the county land at a maximum U-factor of 0.30. The Town changed from 0.28 to get there and the county came down from 0.32.

TOWN WAS

U-0.28

eased slightly to 0.30

COUNTY WAS

U-0.32

tightened to 0.30

BOTH, FROM JAN 1

U-0.30

maximum for windows

A good dual-pane low-E unit gets there. Where it does not, the usual fix is a low-E coating on the room-side surface of the glass rather than a jump to triple pane. If a supplier mentions an i89 coating, that is what they are talking about. 

​

The testing question, answered

The county deleted blower-door and duct testing years ago. They come back on January 1, but conditionally. The county's wording is that testing is required if service is reasonably available. The Town says the same thing more clearly: required if testing is available locally without additional cost based on our location.

​

Read plainly, that means if you would have to bring a tester in from out of the area and pay for the trip, it is not required. It is a rural allowance. It is also undefined enough that it is worth settling with the building department on your job rather than assuming.

​

Pre-wiring for solar

The county also picked up the state electric-ready and solar-ready requirements. The state electrical inspector administers those, not the county. The working rule is that if there is room in the panel to pre-wire for solar, it should be done. It is cheap during construction and it is not cheap afterward.

BLOWER-DOOR TESTING

Only if locally available

confirm it for your job with the county

SOLAR

Pre-wire for it

if there is room in the panel

Covered patio with a stacked-stone fireplace wall, open to a pine forest

One wall, two codes

Both code changes land on the same wall. The energy code requires more insulation. The wildfire code dictates an outside that will not burn.​

From the drafting table

That sounds like two problems, but it is one system. As we design the house, using the right combination of sheathing, insulation and siding answers both codes at the same time. There are several ways to get there and it will depend on the style and look you want for your home. That is a conversation we will have early in the design, before I get into the structural drawings.

Related pages

The 2027 building code changes

Snow loads in Archuleta County

Building to the wildfire code

​​

Where this comes from

Archuleta County Resolution 2026-50 adopts the 2024 International Energy Conservation Code effective January 1, 2027. The Town of Pagosa Springs adopted the same code in Ordinance 1034. Archuleta County is in Climate Zone 6. Reviewed October 2026.

bottom of page